Unofficial tracker
Build a house.
Track a one-family building permit from Public Works intake to your certificate of occupancy.
- 12
- steps on every file
- 15
- more, only if a reviewer adds them
- 14
- agencies that can be involved
- $0
- taken here. Fees are paid in person
Who touches it
Public Works leads. Other agencies join when the file needs them.
The steps
Open a stage to see what happens in it.
Intake1 step
- DPW intakedpw · every file
Plan review7 steps
- Architectural plan reviewdpw · every file
Assumed for a new one-family building. The DPW form treats plan-review disciplines as indicated. Confirm with DPW before treating this as always required.
- Structural plan reviewdpw · every file
Assumed for a new one-family building. The DPW form treats plan-review disciplines as indicated. Confirm with DPW before treating this as always required.
- Mechanical and plumbing plan reviewdpw · when routed
DPW plan-review discipline. Route only if it applies. Not default-routed on this template.
- Flood control reviewdpw · when routed
On the DPW plan-review list. Route when the lot is in a flood zone. Not default-routed.
- HPCC plan reviewdpw · when routed
Printed as HPCC on the DPW plan-review list used for this template. The expansion of that acronym is not confirmed here.
- Hydraulics and civil plan reviewdpw · when routed
DPW plan-review discipline. Route only if it applies. Not default-routed on this template.
- Highway, right-of-way, and traffic reviewdpw · when routed
DPW plan-review discipline. Route only if the work touches a road or right of way. Not default-routed.
Clearances12 steps
- Zoning examinationdlm · every file
- GEPA building-permit reviewgepa · when routed
GEPA reviews building permits and wastewater. This flow is public sewer only, not septic or ANODS. Whether GEPA is always routed for a sewered one-family house is not confirmed, so it is not default-routed.
- GWA water and sewer availabilitygwa · every file
Default-routed because this flow assumes public water and public sewer. Confirm with DPW and GWA for a typical house.
- GPA power clearancegpa · when routed
Published: for a new building, apply for power 8 months before you need it (12 months for a pad-mounted transformer), so the Power Authority can order materials. Power Authority forms and permits
Listed on the DPW application as a clearance to route as indicated. Not confirmed as always required for a private one-family house on public sewer.
- Fire Prevention plan checkgfd · when routed
Listed on the DPW application as a clearance to route as indicated. Not confirmed as always required for a private one-family house on public sewer.
- Public Health clearancedphss · when routed
Listed on the DPW application as a clearance to route as indicated. Not confirmed as always required for a private one-family house on public sewer.
- Contractors License Board clearanceclb · when routed
Listed on the DPW application as a clearance to route as indicated. Not confirmed as always required for a private one-family house on public sewer.
- PEALS registration checkpeals · when routed
The DPW form asks for an architect or engineer seal number as required. PEALS registration is not confirmed as its own clearance on every house.
- Parks and Recreation clearancedpr · when routed
Listed on the DPW application as a clearance to route as indicated. Not confirmed as always required for a private one-family house on public sewer.
- Agriculture clearancedoag · when routed
Listed on the DPW application as a clearance to route as indicated. Not confirmed as always required for a private one-family house on public sewer.
- USACE clearanceusace · when routed
Listed on the DPW application. A private one-family house on public sewer with no wetland or seashore work is assumed not to need USACE. That is not an official determination.
- Historic preservation certificate of approvalghpo · when routed
Published: the Historic Preservation Office's goal for a certificate of approval is 30 days. The Public Auditor measured an average of 37 days, with a range of 0 to 205, for fiscal years 2018 to 2023. Public Auditor report 25-05
21 GCA §76511 requires a certificate of approval when it applies. When it is N/A for a typical house is not confirmed. Staff can mark this step n/a with a reason. It does not block other clearances while it is not started.
Fees2 steps
- Fee assessmentdpw · every file
No dollar amount is stored on the template. Staff enter the assessed amount on the application. The published dollar schedule is not confirmed.
- In-person payment at Treasurer of Guamtog · every file
Paid in person at the BLPC cashier. Permit GU does not take payment online.
Issued1 step
- Issue building permitdpw · every file
The permit number this demo assigns is not an official DPW number.
Inspections3 steps
- Foundation inspectiondpw · list not confirmed
Provisional. The DPW Director sets the inspection list (21 GCA §66403). Foundation, framing, and final are a placeholder, not a confirmed home checklist.
- Framing inspectiondpw · list not confirmed
Provisional. The DPW Director sets the inspection list (21 GCA §66403). Not confirmed as DPW's current home checklist.
- Final inspectiondpw · list not confirmed
Provisional. The DPW Director sets the inspection list (21 GCA §66403). Not confirmed as DPW's current home checklist.
Occupancy1 step
- Certificate of occupancydpw · every file
Good to know
- This is for a new house on public sewer. A septic tank, a wetland, or a shoreline lot follows the clearing guide.
- It does not replace the paper application. The owner still signs the official form.
- Which steps apply to every house is an assumption here, not a confirmed Public Works rule.