Build a house.

Track a one-family building permit from Public Works intake to your certificate of occupancy.

12
steps on every file
15
more, only if a reviewer adds them
14
agencies that can be involved
$0
taken here. Fees are paid in person

Who touches it

Public Works leads. Other agencies join when the file needs them.

dlmgepagwagpagfddphssclbpealsdprdoagusaceghpotogdpwleads
Solid ring: on every file. Dashed ring: only when a reviewer routes it.

The steps

Open a stage to see what happens in it.

Intake1 step
  1. DPW intakedpw · every file
Plan review7 steps
  1. Architectural plan reviewdpw · every file

    Assumed for a new one-family building. The DPW form treats plan-review disciplines as indicated. Confirm with DPW before treating this as always required.

  2. Structural plan reviewdpw · every file

    Assumed for a new one-family building. The DPW form treats plan-review disciplines as indicated. Confirm with DPW before treating this as always required.

  3. Mechanical and plumbing plan reviewdpw · when routed

    DPW plan-review discipline. Route only if it applies. Not default-routed on this template.

  4. Flood control reviewdpw · when routed

    On the DPW plan-review list. Route when the lot is in a flood zone. Not default-routed.

  5. HPCC plan reviewdpw · when routed

    Printed as HPCC on the DPW plan-review list used for this template. The expansion of that acronym is not confirmed here.

  6. Hydraulics and civil plan reviewdpw · when routed

    DPW plan-review discipline. Route only if it applies. Not default-routed on this template.

  7. Highway, right-of-way, and traffic reviewdpw · when routed

    DPW plan-review discipline. Route only if the work touches a road or right of way. Not default-routed.

Clearances12 steps
  1. Zoning examinationdlm · every file
  2. GEPA building-permit reviewgepa · when routed

    GEPA reviews building permits and wastewater. This flow is public sewer only, not septic or ANODS. Whether GEPA is always routed for a sewered one-family house is not confirmed, so it is not default-routed.

  3. GWA water and sewer availabilitygwa · every file

    Default-routed because this flow assumes public water and public sewer. Confirm with DPW and GWA for a typical house.

  4. GPA power clearancegpa · when routed

    Published: for a new building, apply for power 8 months before you need it (12 months for a pad-mounted transformer), so the Power Authority can order materials. Power Authority forms and permits

    Listed on the DPW application as a clearance to route as indicated. Not confirmed as always required for a private one-family house on public sewer.

  5. Fire Prevention plan checkgfd · when routed

    Listed on the DPW application as a clearance to route as indicated. Not confirmed as always required for a private one-family house on public sewer.

  6. Public Health clearancedphss · when routed

    Listed on the DPW application as a clearance to route as indicated. Not confirmed as always required for a private one-family house on public sewer.

  7. Contractors License Board clearanceclb · when routed

    Listed on the DPW application as a clearance to route as indicated. Not confirmed as always required for a private one-family house on public sewer.

  8. PEALS registration checkpeals · when routed

    The DPW form asks for an architect or engineer seal number as required. PEALS registration is not confirmed as its own clearance on every house.

  9. Parks and Recreation clearancedpr · when routed

    Listed on the DPW application as a clearance to route as indicated. Not confirmed as always required for a private one-family house on public sewer.

  10. Agriculture clearancedoag · when routed

    Listed on the DPW application as a clearance to route as indicated. Not confirmed as always required for a private one-family house on public sewer.

  11. USACE clearanceusace · when routed

    Listed on the DPW application. A private one-family house on public sewer with no wetland or seashore work is assumed not to need USACE. That is not an official determination.

  12. Historic preservation certificate of approvalghpo · when routed

    Published: the Historic Preservation Office's goal for a certificate of approval is 30 days. The Public Auditor measured an average of 37 days, with a range of 0 to 205, for fiscal years 2018 to 2023. Public Auditor report 25-05

    21 GCA §76511 requires a certificate of approval when it applies. When it is N/A for a typical house is not confirmed. Staff can mark this step n/a with a reason. It does not block other clearances while it is not started.

Fees2 steps
  1. Fee assessmentdpw · every file

    No dollar amount is stored on the template. Staff enter the assessed amount on the application. The published dollar schedule is not confirmed.

  2. In-person payment at Treasurer of Guamtog · every file

    Paid in person at the BLPC cashier. Permit GU does not take payment online.

Issued1 step
  1. Issue building permitdpw · every file

    The permit number this demo assigns is not an official DPW number.

Inspections3 steps
  1. Foundation inspectiondpw · list not confirmed

    Provisional. The DPW Director sets the inspection list (21 GCA §66403). Foundation, framing, and final are a placeholder, not a confirmed home checklist.

  2. Framing inspectiondpw · list not confirmed

    Provisional. The DPW Director sets the inspection list (21 GCA §66403). Not confirmed as DPW's current home checklist.

  3. Final inspectiondpw · list not confirmed

    Provisional. The DPW Director sets the inspection list (21 GCA §66403). Not confirmed as DPW's current home checklist.

Occupancy1 step
  1. Certificate of occupancydpw · every file

Good to know

  • This is for a new house on public sewer. A septic tank, a wetland, or a shoreline lot follows the clearing guide.
  • It does not replace the paper application. The owner still signs the official form.
  • Which steps apply to every house is an assumption here, not a confirmed Public Works rule.