Water service connection.

Unofficial tracker for a new water connection and meter from the Guam Waterworks Authority. Apply any time during construction, ideally before your contractor works in the right of way. A sewer connection follows the same steps with a Wastewater Connection Permit and is not tracked separately here.

6
steps on every file
0
more, only if a reviewer adds them
1
agency involved
$0
taken here. Fees are paid in person

Who touches it

Guam Waterworks Authority leads and sends the file to each agency that has to clear it.

gwaleads
Solid ring: on every file. Dashed ring: only when a reviewer routes it.

The steps

Open a stage to see what happens in it.

Intake1 step
  1. Customer Service: account and work ordergwa · every file

    Bring the customer information paper, your certificate of title or deed of gift, your building permit, and a map to the site. Waterworks gives you an account and work order number. Customer Service: (671) 647-7800.

Clearances2 steps
  1. Permit to Tapgwa · every file

    Filled out with the Permits and Inspections staff once you have the work order number. (671) 300-6058.

  2. Inspection of the trench and tapgwa · every file

    Give Waterworks 48 hours' notice before trenching, meter installation, or tapping. After inspection you get a Job Cost Sheet. In this tracker both review steps open together. The real order is the permit first.

Fees2 steps
  1. Job Cost Sheetgwa · every file

    No dollar amount is stored. The amount is on the Job Cost Sheet Waterworks gives you after inspection. A reviewer types it.

  2. Job Cost Sheet paidgwa · every file

    PermitGU does not take payment.

Issued1 step
  1. Meter installedgwa · every file

    Published: once the Job Cost Sheet is paid, Waterworks says the meter is typically installed in 3 to 5 working days. Waterworks service steps

    The number shown is a demo number. It is not a Waterworks account or work order number.

Good to know

  • This tracker does not replace the agency's own application. The applicant still files and signs the official one.
  • You upload 3 papers before you submit: Authorization from the owner, Certificate of title or deed of gift, Customer information paper.
  • The steps here were entered by a PermitGU admin from the public record. They are not confirmed by Guam Waterworks Authority.
  • Source: the official page this was built from.