Building permit for a repair.

Unofficial tracker for a building permit to repair or reconstruct an existing building, such as after a typhoon. Small repairs done by the owner are often exempt. Read the typhoon repair guide first to see whether you need a permit at all.

5
steps on every file
4
more, only if a reviewer adds them
4
agencies that can be involved
$0
taken here. Fees are paid in person

Who touches it

Department of Public Works leads and sends the file to each agency that has to clear it.

dlmclbpealsdpwleads
Solid ring: on every file. Dashed ring: only when a reviewer routes it.

The steps

Open a stage to see what happens in it.

Intake1 step
  1. Intake at Building Inspection and Permitsdpw · every file

    Filed on the same Application for Permit and Plan Review as a new building, with "Repair" or "Reconstructed" checked. Owner-done work can be exempt: up to 25% of a roof covering, or nonstructural repairs up to 25% of the value (21 GCA §66202). Read the typhoon repair guide first.

Clearances5 steps
  1. Plan reviewdpw · every file

    The application lists Public Works reviews: architectural, structural, mechanical and plumbing, flood control, HPCC, hydraulics and civil, highway, right of way, and traffic. The Guidebook says each applies for what the project entails. A small repair may need only some.

  2. Land Management zoning clearancedlm · when routed

    On the application routing list. Required "for what the project entails" (2022 Guidebook). Not confirmed for every repair, so a reviewer adds it.

  3. Contractors License Board clearanceclb · when routed

    On the application routing list. Likely only when a contractor does the work. Not confirmed, so a reviewer adds it.

  4. Engineer or architect stamp checkpeals · when routed

    On the application routing list. Likely only when stamped plans are filed for structural work. Not confirmed, so a reviewer adds it.

  5. Other clearances as indicateddpw · when routed

    The application also routes to Public Health, Guam EPA, Waterworks, the Power Authority, Fire Prevention, Parks, Agriculture, and the Army Corps as indicated. Which ones a repair needs is not published.

Fees2 steps
  1. Fee assessmentdpw · every file

    No dollar amount is stored. We found no published fee for a typical roof repair. Fees double if work starts before the permit (21 GCA §66408).

  2. Fee paid in persondpw · every file

    PermitGU does not take payment.

Issued1 step
  1. Permit issueddpw · every file

    The number shown is a demo number. After it is issued, schedule Public Works inspections as work progresses and keep the permit and approved plans on site. This tracker stops at issue.

Good to know

  • This tracker does not replace the agency's own application. The applicant still files and signs the official one.
  • You upload 4 papers before you submit: Application for Permit and Plan Review, Plans and scope of work, Recorded property map, lease, or authorization, Topographic map and flood elevation certificate.
  • The steps here were entered by a PermitGU admin from the public record. They are not confirmed by Department of Public Works.
  • Source: the official page this was built from.