Power service connection.

Unofficial tracker for starting electric service with the Guam Power Authority. Apply at the payment center in Fadian, the Hagåtña satellite office, Waterworks in upper Tumon, or by email.

6
steps on every file
0
more, only if a reviewer adds them
2
agencies that can be involved
$0
taken here. Fees are paid in person

Who touches it

Guam Power Authority leads and sends the file to each agency that has to clear it.

dpwgpaleads
Solid ring: on every file. Dashed ring: only when a reviewer routes it.

The steps

Open a stage to see what happens in it.

Intake1 step
  1. Application receivedgpa · every file

    Published: for a new building, apply 8 months before you need power (12 months for a pad-mounted transformer), so the Power Authority can order materials. Power Authority forms and permits

    Application and Agreement for Electric Service, with a photo ID and your deed, title, or lease with authorization. Businesses also bring a business license and EIN. For a new building, apply 8 months before you need power (12 for a padmount transformer). A house that already has a meter skips the reviews.

Clearances2 steps
  1. Plan review and site investigationgpa · every file

    For new construction, the plans need a load calculation and an engineer's seal, and Power Authority engineering visits the site. Underground jobs and easements add steps not tracked here.

  2. Public Works electrical inspectiondpw · every file

    A new service is not energized without it. The Power Authority issues an Electrical Inspection Report form and a Public Works electrical inspector approves it (form SP-100: "DPW inspection report required").

Fees2 steps
  1. Fee and deposit assessmentgpa · every file

    No dollar amount is stored. The published application fee is $25. Residential deposits run from $125 (1 bedroom, no air conditioning) to $500 (4 bedrooms with air conditioning). Other deposits are at most 2.5 times the estimated monthly bill and never under $125.

  2. Fee and deposit paidgpa · every file

    PermitGU does not take payment.

Issued1 step
  1. Meter set and service energizedgpa · every file

    Published: same-day connection is available for a $9 fee. It appears to cover a place that already has a meter, not a new building. Power Authority start, stop, and move

    The number shown is a demo number. It is not a Power Authority account number. Reconnecting an existing meter the same day costs $9.

Good to know

  • This tracker does not replace the agency's own application. The applicant still files and signs the official one.
  • You upload one paper before you submit: Deed, title, or lease with authorization.
  • The steps here were entered by a PermitGU admin from the public record. They are not confirmed by Guam Power Authority.
  • Source: the official page this was built from.